SL NO.

Description

Expected Data

1

 

 

 

 

District and upozila under Rajshahi Distribution zone     

Total 8 district and 19 upozila

Total no. of customer (Till Oct 2016) Rajshahi

7,11,128( Seven lakh eleven thousand one hundred twenty eight) 60%

Total no. of customer (Till Oct 2016) Rangpur

4,80,259(Four lakh eighty thousand two hundred fifty nine) 40%

Total

11,91,387

Difference  

2,30,859(Two lakh thirty thousand eight hundred fifty nine)

2

Average Import Unit Per Month

145-184 Mkwh Av-161(sixteen corer one lakh unit)

3

Average Sold Unit Per Month

128-159 Mkwh Av-140(fourteen corer unit)

4

Average Billed Amount Per Month

764-960 Mtk Av-862(Eighty corer two lakh taka)

5

Average Collected Amount Per Month

796-912 Mtk Av-854(Eighty fife corer taka)

6

Target of Sys. Loss & Achieve Up to FY-2015-16(June/2016)

T=10.92%, A-10.62%

7

Equivalent Bill Month FY-2014-16

2.46

8

Target CI Ratio & Achieve FY-2014-16(June2016)

T=92.13%, A=86.88%

 

Target CI Ratio & Achieve FY-2016-16-7

T=91.04%

9

Connected consumer number of last 7 years (Dec/2009 April/2016

682790-384788=2,98,002( Two lakh ninety eight thousand) Cont Load= 1200-564=636MW

 

Consumer growth rate

7%

10

Pending bill of city corporation till June 2016

22,54(Twenty two corer fifty four lakh) Pending bill equal month 42.34 till June2016

11

Rajshahi Wasa

On 31.07.2011 City Corporation water pumps was handover to WASA by BDT. 8,49,50,000. Current credit BDT. 1228.19, which is equivalent of 3.20 months.

12

Highest Load in 2014

780 MW ( BUB 310 MW and POBIS 470 MW) 30/03/014

 

Highest Load in 2015

853 MW (BUB 314 MW and POBIS 539 MW 10/10/15) Increase 2.00pm73 MW

 

Highest Load in 2016

983 MW (BUB 380 MW and POBIS 719 MW 19/10/16) 19.30

 

BUB highest demand on 2015

350 MW

 

Highest Load taken in Rajshahi on 2015

87 MW, On 2014 was 70 MW Increase 17 MW

 

Rajshahi metro present

BUB 87MW 2014 was 70 MW Total 137 MW

13

Average load shedding

0 Free from load shedding

14

No. 33 KV feeder

 

29

15

No. 11 KV feeder

 

155

16

Length of distribution line

 

 

 

33 KV Line

400 Km

 

 

Distribution 11KV Line

2281 Km

 

 

Distribution  11/04 KV Line

1605 Km

 

 

Distribution  0.4 KV Line

3143 Km

 

 

Distribution  0.2 KV Line

385 Km

 

 

Total

7814 Km

17

33/11 KV sub-station number and capacity

29 Capacity-635/838 MVA           

18

 Distribution transformer number and capacity

4133, 647140 KVA

19.

Number and load of pumps under Rajshahi zone

PDB=5721, REB=6500MW Total=70621 Load

PDB =50MW, REB =200 MW Total=250 MW

 

 

Deep tube-well (average 18-29.5 Kw)

PDB =1101, REB =15,844 Total =16945 Load

PDB =25 MW,REB =123 MW Total =150 MW

 

 

None deep tube-well  (average load 5-8 Kw)

PDB =3649, REB =48,188 Total =51,837 Load

PDB =22 MW,REB =58 MW Total =80 MW

 

 

Low-lift pump (average 10Kw)

PDB =388, REB =968 Total = 1356 Load

PDB =3 MW,REB =19 MW Total =80 MW